Siemens, Erlangen

After days of work, you would normally want to see the results. – This is not the case with concrete cosmetics and touch-up work: the less you see, the more successful the work has been!!
The main stairwell of the new Siemens AG office building in Erlangen has walls, ceilings and stairwells made of exposed concrete. Casting faults and damage caused during construction meant that considerable cosmetic concrete work was required. Where material had to be filled in, the repair sites were levelled with the surrounding exposed concrete by carrying out touch-ups with various concrete lasurs.

Customer:
Project title:
Project scope:

Colour design:
NCM Erlangen
New construction of Siemens office building
Exposed concrete cosmetic treatments and touch-ups to internal walls
Staab Architekten, Berlin